“IE Access has it’s roots in highly technical and challenging scaffolding projects, and our pre-construction and design process is industry leading.
Each individual scaffold is built to either a NASC Guidance TG20:21 compliance, or a bespoke and fully engineered design drawing, along with supporting calculations.
We work with all of our clients to ensure that the design, loadings, and all technical detail, is suitable for the works being carried-out”.